First Notice | | | 6/25/2003 | | DONE |
|
|
|
|
DOC - Permit Finaled | 6/10/2003 | 6/10/2003 | 6/10/2003 | P | PASS |
Bill VanDegrift
|
|
|
final ok
|
Final | 6/10/2003 | 6/10/2003 | 6/10/2003 | P | PART |
Bill VanDegrift
|
|
|
signed temp card but now they need a water supply to the soap disp. above the mop sink and a back flow preventor, this is work outside of the original permit 6/10/2003 2:07:59 PM 6/10/2003 2:08:21 PM
|
Final | 6/10/2003 | 6/10/2003 | 6/10/2003 | P | PASS |
Bill VanDegrift
|
|
|
final ok
|
Second Notification | 5/8/2003 | 5/8/2003 | 5/23/2003 | | DONE |
|
|
|
First Notice has not been responded to.
|
Final | 5/16/2003 | 5/16/2003 | 5/16/2003 | P | PART |
Bill VanDegrift
|
|
|
final ok 5/16/2003 4:01:26 PM temp occ ok needs to set all equipment 5/16/2003 4:01:57 PM
|
Final | 5/12/2003 | 5/13/2003 | 5/13/2003 | A | FAIL |
Bill VanDegrift
|
|
|
###-#### keri need bldg final prior to occ, pipe ice bin drain seprately from other wastes, 5/13/2003 3:42:34 PM
|
CHANGE STATUS TO (I) | | | 5/12/2003 | | DONE |
|
|
|
|
First Notice | | 3/21/2003 | 5/8/2003 | | DONE |
|
|
|
|
DOC - Permit Finaled | 3/21/2003 | 3/21/2003 | 3/21/2003 | P | PASS |
Bill VanDegrift
|
|
|
Finaled by inspector at 3/21/2003 3:59:57 PM
|
Plumbing Rough-in | 3/20/2003 | 3/21/2003 | 3/21/2003 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 3/20/2003 at 3:34:48 PM. Contact: ###-####. waste below floor test ok 3/21/2003 10:31:14 AM
|
Plumbing Rough-in | 3/21/2003 | 3/21/2003 | 3/21/2003 | P | PASS |
Bill VanDegrift
|
|
|
ri complete 3/21/2003 3:59:55 PM
|
Plumbing Rough-in | 3/7/2003 | 3/7/2003 | 3/7/2003 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 3/7/2003 at 7:56:11 AM. Contact: ###-####. up top ri ok 3/7/2003 12:47:24 PM
|
Application received | | | 2/21/2003 | | |
|
|
|
|
Issue & PRINT permit | | | 2/21/2003 | | |
|
|
|
|