PostCard Mailed | | | 8/4/2004 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
PostCard Mailed | | | 2/19/2004 | | SENT |
|
|
|
PostCard has been mailed requesting inspection.
|
Final | 8/15/2003 | 8/15/2003 | 8/15/2003 | P | PASS |
Bill VanDegrift
|
|
|
final ok enough to get moved in , will calll when the heat exchanger for the floor heat is installed 8/15/2003 3:42:06 PM
|
Final | 8/14/2003 | 8/14/2003 | 8/14/2003 | P | FAIL |
Bill VanDegrift
|
|
|
jake; Phone #: ###-#### Internet Inspection Request from: Barbara Moore air gap t&p drain , secure hose bibs, complete radiant floor heating system prior to final. 8/14/2003 4:33:41 PM
|
Final | 7/30/2003 | 7/30/2003 | 7/30/2003 | A | PASS |
Lee Rice
|
|
|
partial final for mother-in-law half of structure. Bill looked at plumbing in this half yesterday and said it was ok. 7/30/2003 12:29:12 PM
|
Final | 7/28/2003 | 7/29/2003 | 7/29/2003 | A | NH |
Bill VanDegrift
|
|
|
jake; Phone #: ###-#### Internet Inspection Request from: Barbara Moore wants a partial final for the south portion of the duplex, told them they'd have to get approval from jg. 7/29/2003 11:59:16 AM
|
Plumbing Rough-in | 5/15/2003 | 5/15/2003 | 5/15/2003 | P | PASS |
Bill VanDegrift
|
|
|
ri ok heat exchanger between water heater and floor heat
|
Plumbing Rough-in | 5/13/2003 | 5/14/2003 | 5/14/2003 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/13/2003 at 6:18:15 PM. Contact: ###-####. provide listing for voyager heat exchanger showing compliance with the upc prior to r/i approval 5/14/2003 9:21:09 AM
|
Plumbing Rough-in | 4/17/2003 | 4/18/2003 | 4/18/2003 | A | PART |
Bill VanDegrift
|
|
|
###-#### jake south side ri ok 4/18/2003 10:04:16 AM
|
Groundwork | 2/24/2003 | 2/25/2003 | 2/25/2003 | A | PASS |
Bill VanDegrift
|
|
|
###-#### gw ok 2/25/2003 11:58:27 AM
|
Issue & PRINT permit | | | 2/24/2003 | | DONE |
|
|
|
|
Application received | | | 2/24/2003 | | |
|
|
|
|