Final | 5/19/2003 | 5/20/2003 | 5/20/2003 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/19/2003 at 12:25:06 PM. final ok with t&p drain turned down 5/20/2003 8:42:17 AM
|
DOC - Permit Finaled | 5/20/2003 | 5/20/2003 | 5/20/2003 | A | PASS |
Bill VanDegrift
|
|
|
Finaled by inspector at 5/20/2003 8:43:58 AM
|
Plumbing Rough-in | 4/1/2003 | 4/1/2003 | 4/1/2003 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/1/2003 at 7:46:05 AM. Contact: ###-####.ri ok 4/1/2003 2:41:45 PM
|
Application received | | | 3/27/2003 | | |
|
|
|
|
Issue & PRINT permit | | | 3/27/2003 | | DONE |
|
|
|
|