First Notice | | 12/15/2005 | 12/15/2005 | | DONE |
|
|
|
|
Telephone Call | | | 6/10/2004 | | DONE |
|
|
|
|
DOC - Permit Finaled | 7/25/2003 | 7/25/2003 | 7/25/2003 | P | PASS |
Bill VanDegrift
|
|
|
Finaled by inspector at 7/25/2003 3:32:43 PM
|
Final | 7/24/2003 | 7/25/2003 | 7/25/2003 | P | PASS |
Bill VanDegrift
|
|
|
final ok 7/25/2003 3:32:41 PM
|
Final | 7/22/2003 | 7/22/2003 | 7/22/2003 | P | PART |
Bill VanDegrift
|
|
|
just needs to test the rp on the steamer and now they've got to get culligan to get a permit for a water softener, dlb fee 7/22/2003 4:26:43 PM
|
Final | 7/18/2003 | 7/18/2003 | 7/18/2003 | P | PART |
Bill VanDegrift
|
|
|
install rp on temper water to steamer, provide a water supply to the chemical feeder at the mop sink. temp occ ok
|
Final | 7/16/2003 | 7/17/2003 | 7/17/2003 | A | NR |
Bill VanDegrift
|
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Moore need to meet the garden city 7/17/2003 9:55:00 AM cross connection control guy Tom Niel at 300pm 7/17/2003 9:55:24 AM
|
Final | 7/17/2003 | 7/17/2003 | 7/17/2003 | P | PART |
Bill VanDegrift
|
|
|
3:00pm call tom first ###-#### 7/17/2003 3:53:15 PM temp occ ok, remove chem feed at mop sink, need device to keep sprayer out of the kettels, may need additional rp on the steamer, will meet with equipment supplier when he shows up. 7/17/2003 3:55:25 PM
|
Final | 7/8/2003 | 7/9/2003 | 7/9/2003 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 7/8/2003 at 5:28:21 PM. Contact: ###-####. f.s.'s need dome strainer, ice bin drain in the bar needs its own drain, set all equipment, 7/9/2003 10:39:43 AM
|
Plumbing Rough-in | 5/23/2003 | 5/23/2003 | 5/23/2003 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 5/23/2003 at 6:40:30 AM. Contact: ###-####. water in outside, wall needs to be f 5/23/2003 11:51:52 AM irred out 5/23/2003 11:52:06 AM
|
Plumbing Rough-in | 4/29/2003 | 4/29/2003 | 4/29/2003 | P | NR |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/29/2003 at 8:01:04 AM. Contact: ###-####.
|
Groundwork | 4/29/2003 | 4/29/2003 | 4/29/2003 | P | PASS |
Bill VanDegrift
|
|
|
gw ok
|
Plumbing Rough-in | 4/28/2003 | 4/28/2003 | 4/28/2003 | P | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/28/2003 at 9:54:45 AM. Contact: ###-####. everything except the grease line by the kitchen ok,,, that line has a leak in the existing piping 4/28/2003 3:03:32 PM
|
Plumbing Rough-in | 4/22/2003 | 4/23/2003 | 4/23/2003 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 4/22/2003 at 5:00:32 PM. Contact: ###-####. ok to move durt and cover misc. piping prior to test. 4/23/2003 10:28:06 AM
|
Plumbing Rough-in | 4/22/2003 | 4/22/2003 | 4/22/2003 | P | PART |
Jim Johnson
|
|
|
###-#### lenny CRABSHACK CRABSHACK CRABSHACK need to provide some bedding material to shade in ground-work instead of river rock need to finish installation of six or more floor sink,s or floor drains also need to test untested portion of ground-work in middle of building on west side of kitchen area 4/22/2003 4:21:54 PM
|
Application received | | | 4/22/2003 | | |
|
|
|
|
Issue & PRINT permit | | | 4/22/2003 | | DONE |
|
|
|
|