Final | 1/6/2004 | 1/7/2004 | 1/7/2004 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 1/6/2004 at 1:40:04 PM. Contact: ###-####. final ok 1/7/2004 9:52:40 AM
|
DOC - Permit Finaled | 1/7/2004 | 1/7/2004 | 1/7/2004 | A | PASS |
Bill VanDegrift
|
|
|
Finaled by inspector at 1/7/2004 9:52:42 AM
|
Plumbing Rough-in | 10/2/2003 | 10/3/2003 | 10/3/2003 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 10/2/2003 at 2:49:21 PM. Contact: ###-####. ri ok utility room 10/3/2003 3:11:46 PM
|
Plumbing Rough-in | 8/13/2003 | 8/14/2003 | 8/14/2003 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/13/2003 at 12:17:16 PM. Contact: ###-####. ok to cover needs to deside if he going to install a fd or pipe t&p and pan drain to garage floor, piping in ceiling will be tented with insulation. 8/14/2003 9:36:56 AM
|
Plumbing Rough-in | 8/4/2003 | 8/6/2003 | 8/6/2003 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/4/2003 at 3:50:18 PM. Contact: ###-####. water undersized, w.h. access?, if in the attic pan and drain, t&p drain missing, protect w.h. from freezing, water to lavs in 2x4 exterior wall, santee on its side at shower drain, wang waste and vent every 4', test all piping 8/6/2003 10:35:35 AM
|
Other | 8/6/2003 | 8/6/2003 | 8/6/2003 | P | PART |
Bill VanDegrift
|
|
|
conference on correcton notice went over correction notice 8/6/2003 4:03:25 PM
|
Application received | | | 6/23/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/23/2003 | | |
|
|
|
|