Final | 1/7/2004 | 1/7/2004 | 1/7/2004 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 1/7/2004 at 8:55:31 AM. Contact: ###-####.
|
DOC - Permit Finaled | 1/7/2004 | 1/7/2004 | 1/7/2004 | P | PASS |
Jim Johnson
|
|
|
Finaled by inspector at 1/7/2004 11:37:50 AM
|
Plumbing Rough-in | 9/15/2003 | 9/16/2003 | 9/16/2003 | A | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/15/2003 at 4:32:44 PM. Contact: ###-####.
|
Application received | | | 9/9/2003 | | |
|
|
|
|
Issue permit | | | 9/9/2003 | | DONE |
|
|
|
Per Jim Johnson, upon inspection, fixture count to be changed to 16. in addition to current count, the following is added: 1-water closet, 2-wash basins and 1- tub/shower. Fees have been added for the added count///MWL 9/16/03
|