Final | 12/17/2003 | 12/18/2003 | 12/18/2003 | A | CANC |
Bill VanDegrift
|
|
|
|
Final | 12/17/2003 | 12/17/2003 | 12/17/2003 | P | PASS |
Bill VanDegrift
|
|
|
final ok
|
DOC - Permit Finaled | 12/17/2003 | 12/17/2003 | 12/17/2003 | P | PASS |
Bill VanDegrift
|
|
|
Finaled by inspector at 12/17/2003 3:05:20 PM
|
Plumbing Rough-in | 12/16/2003 | 12/17/2003 | 12/17/2003 | P | PASS |
Bill VanDegrift
|
|
|
3 or so ri ok final ok allthe fixtures are set just needs to calk lav when tile is complete, cap shower drain/ lav waste connection. 12/17/2003 3:04:57 PM
|
Plumbing Rough-in | 12/15/2003 | 12/16/2003 | 12/16/2003 | P | CANC |
Bill VanDegrift
|
|
|
3pm or so
|
Other | 12/5/2003 | 12/5/2003 | 12/5/2003 | A | PART |
Bill VanDegrift
|
|
|
conference ok venting
|
Final | 11/19/2003 | 11/20/2003 | 11/20/2003 | A | NR |
Bill VanDegrift
|
|
|
###-#### valerie this should be a r/i 11/20/2003 9:09:42 AM
|
Plumbing Rough-in | 11/20/2003 | 11/20/2003 | 11/20/2003 | A | FAIL |
Bill VanDegrift
|
|
|
vent tub, shower and lav. max tailpiece length is 24". max. fu laoding per table 6-5. hang dwv and water per table 3-2. tests required. grade waste 1/4" per foot toward building sewer.
|
Application received | | | 11/19/2003 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/19/2003 | | DONE |
|
|
|
|