Final | 7/29/2004 | 7/29/2004 | 7/29/2004 | A | PASS |
Jim Johnson
|
|
|
|
DOC - Permit Finaled | 7/29/2004 | 7/29/2004 | 7/29/2004 | A | PASS |
Jim Johnson
|
|
|
Finaled by inspector at 7/29/2004 9:27:56 AM
|
Final | 7/21/2004 | 7/21/2004 | 7/21/2004 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 7/21/2004 at 7:26:17 AM. Contact: ###-####. need sprinkler tie-in and backflow permitted and inspected before final on duplex called plumbing contractor and told him. 7/21/2004 11:50:28 AM
|
Plumbing Rough-in | 4/13/2004 | 4/13/2004 | 4/13/2004 | P | PASS |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/13/2004 at 9:36:44 AM. Contact: ###-####.
|
Plumbing Rough-in | 4/12/2004 | 4/12/2004 | 4/12/2004 | P | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 4/12/2004 at 9:30:33 AM. Contact: ###-####. need to pre-plumb water softener loop,s DWV test ok will need to retest water system contractor to recall when ready 4/12/2004 1:53:02 PM
|
Application received | | | 3/12/2004 | | |
|
|
|
|
Issue permit | | | 3/12/2004 | | DONE |
|
|
|
|