Final | 9/10/2004 | 9/10/2004 | 9/10/2004 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 9/10/2004 at 8:11:14 AM. Contact: ###-####.
|
DOC - Permit Finaled | 9/10/2004 | 9/10/2004 | 9/10/2004 | P | PASS |
Gary Ziegler
|
|
|
Finaled by inspector at 9/10/2004 3:39:55 PM
|
Plumbing Rough-in | 7/9/2004 | 7/9/2004 | 7/9/2004 | P | PASS |
Gary Ziegler
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Plumbing Rough-in | 7/7/2004 | 7/8/2004 | 7/8/2004 | A | FAIL |
Gary Ziegler
|
|
|
###-#### john move water on softner loop and washer to the front of stud cavity gz 7/8/2004 11:46:40 AM
|
Override - Parcel Holds | | | 7/7/2004 | | |
|
|
|
|
Issue permit | | | 7/7/2004 | | |
|
|
|
|
Application received | | | 7/7/2004 | | |
|
|
|
|
Override - Parcel Holds | | | 7/7/2004 | | |
|
|
|
|