Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberPLM04-02475
StatusFinaled
Name PARK CENTER PLUMBING INC
Site Address 6325 N CLOVERDALE RD
Project NameSpringhill Suites by Marriott
Customer Number 
ePlanReview 
Description
Complete plumbing for 119 unit 4 story hotel--Cast iron DWV, cipper water lines, 123 water closets, 1 urinal, 122 lavatories, 119 tub/showers, 2 ada showers, 119 bar sinks, 4 water heaters, 1 breakroom sink, 4 roof drains, 2 seperate rec/rc systems, 1 trench drain, 8 hose bibbs, 1 mop sink, 12 floor drains, 6 floor sinks per initial cert of value $430,000///8/26/04 BAM///final cert of value $439,552///7/12/05 LEM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice PLM7/8/20057/8/20057/12/2005 DONE
First Notice has not been responded to.
First Notice 6/1/20057/8/2005 DONE
Final6/1/20056/1/20056/1/2005PPASS
DetailsDaryl Spivey
###-#### - joan
Final5/26/20055/27/20055/27/2005APART
DetailsDaryl Spivey
walk thru with plumber for backflow protection on owner supplied equip
Final5/25/20055/26/20055/26/2005APART
DetailsDaryl Spivey
Still needs backflow protection on owner equip installs
Final5/26/20055/26/20055/26/2005PPART
DetailsDaryl Spivey
walk thru with Bill T from United Water. Still needs to have some equipment supplied with backflow protection. Plumber notified and will do walk thru tomorrow at 10 am
Final5/25/20055/26/20055/26/2005APASS
DetailsDixie Fellows
per your request
Final5/25/20055/25/20055/25/2005PFAIL
DetailsDixie Fellows
per your request..need 3/4" HARD PIPE INTO POOL EQUIPMENT PER MANUFACTURER
Final5/25/20055/25/20055/25/2005APART
DetailsDaryl Spivey
Scheduled by a contractor via Hello! on 5/25/2005 at 7:28:19 AM. Contact: ###-####.
Final5/11/20055/11/20055/11/2005PPART
DetailsDaryl Spivey
Scheduled by a contractor via Hello! on 5/11/2005 at 8:52:33 AM. Contact: ###-####. need installation of appliances and waher info.
Final5/10/20055/10/20055/10/2005PPART
DetailsDaryl Spivey
Scheduled by a contractor via Hello! on 5/10/2005 at 8:46:03 AM. Contact: ###-####. Need baskets for floor sinks, installation paperwork for washers to see if rp is needed, coffee maker paperwork for rp installment, and pool area and equipment not
Final4/22/20054/22/20054/22/2005PPART
DetailsDaryl Spivey
Scheduled by a contractor via Hello! on 4/22/2005 at 8:29:40 AM. Contact: ###-####. All rooms except ADA rooms are passed.
Water and/or Sewer3/15/20053/15/20053/15/2005APART
DetailsRon Ginner
Scheduled by a contractor via Hello! on 3/15/2005 at 7:28:56 AM. Contact: ###-####. 4" water lines ran out to pump house and back to main building. 3/15/2005 11:54:36 AM
Plumbing Rough-in3/10/20053/10/20053/10/2005PPART
DetailsRon Ginner
Scheduled by a contractor via Hello! on 3/10/2005 at 7:46:18 AM. Contact: ###-####. inspected mechanical room and went thru project with contractor. 3/10/2005 3:28:15 PM
Groundwork2/18/20052/18/20052/18/2005PPASS
DetailsGerry Varner
Scheduled by a contractor via Hello! on 2/18/2005 at 8:03:24 AM. Contact: ###-####.
Plumbing Rough-in2/4/20052/4/20052/4/2005PPART
DetailsRon Ginner
Scheduled by a contractor via Hello! on 2/4/2005 at 8:03:53 AM. Contact: ###-####.
Plumbing Rough-in1/21/20051/21/20051/21/2005PPART
DetailsRon Ginner
Scheduled by a contractor via Hello! on 1/21/2005 at 8:40:15 AM. Contact: ###-####.
Plumbing Rough-in1/11/20051/12/20051/12/2005APART
DetailsRon Ginner
raul; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
Plumbing Rough-in12/30/200412/30/200412/30/2004PPART
DetailsRon Ginner
Scheduled by a contractor via Hello! on 12/30/2004 at 8:39:56 AM. Contact: ###-####.
Plumbing Rough-in12/28/200412/29/200412/29/2004PPART
DetailsRon Ginner
Scheduled by a contractor via Hello! on 12/28/2004 at 11:57:24 AM. Contact: ###-####.
Plumbing Rough-in12/23/200412/23/200412/23/2004PPART
DetailsRon Ginner
Scheduled by a contractor via Hello! on 12/23/2004 at 8:19:13 AM. Contact: ###-####.
Plumbing Rough-in12/22/200412/22/200412/22/2004PPART
DetailsGerry Varner
Scheduled by a contractor via Hello! on 12/22/2004 at 8:56:31 AM. Contact: ###-####.
Plumbing Rough-in12/21/200412/21/200412/21/2004PPART
DetailsGerry Varner
Scheduled by a contractor via Hello! on 12/21/2004 at 8:23:47 AM. Contact: ###-####.
Plumbing Rough-in12/20/200412/20/200412/20/2004PPART
DetailsGerry Varner
Scheduled by a contractor via Hello! on 12/20/2004 at 8:09:02 AM. Contact: ###-####. eight units 2 -3- floor south end R.I. only this date. 12/20/2004 3:11:17 PM
Groundwork11/30/200411/30/200411/30/2004PPASS
DetailsRon Ginner
Scheduled by a contractor via Hello! on 11/30/2004 at 7:52:06 AM. Contact: ###-####.
Plumbing Rough-in11/16/200411/16/200411/16/2004PPART
DetailsRon Ginner
Shawn; Phone #: ###-#### Internet Inspection Request from: Cheryl Baumgartner reviewed suds relief 11/16/2004 2:06:01 PM
Water and/or Sewer10/13/200410/13/200410/13/2004PPART
DetailsJim Johnson
Scheduled by a contractor via Hello! on 10/13/2004 at 7:42:40 AM. Contact: ###-####. copper stub for water line from inside building to 5 foot outside ok 10/13/2004 3:19:22 PM 10/13/2004 3:20:08 PM
Groundwork9/15/20049/15/20049/15/2004APASS
DetailsRon Ginner
Scheduled by a contractor via Hello! on 9/15/2004 at 7:28:18 AM. Contact: ###-####.
Groundwork9/14/20049/14/20049/14/2004PNR
DetailsRon Ginner
Scheduled by a contractor via Hello! on 9/14/2004 at 7:50:10 AM. Contact: ###-####. need several cleanouts on end of lines 9/14/2004 2:16:11 PM
Groundwork9/13/20049/13/20049/13/2004PNR
DetailsGerry Varner
Scheduled by a contractor via Hello! on 9/13/2004 at 7:47:14 AM. Contact: ###-####.
Groundwork9/3/20049/3/20049/3/2004PPART
DetailsRon Ginner
Scheduled by a contractor via Hello! on 9/3/2004 at 9:28:59 AM. Contact: ###-####. to grid line 12 okay 9/3/2004 2:03:21 PM
Groundwork9/1/20049/1/20049/1/2004PPART
DetailsRon Ginner
Scheduled by a contractor via Hello! on 9/1/2004 at 11:17:32 AM. Contact: ###-####. ground work from south to grid line 10 tested. 9/1/2004 3:42:29 PM
Plumbing Rough-in8/26/20048/27/20048/27/2004ACANC
DetailsRon Ginner
joe ###-#### this is a ground work 8/27/2004 10:04:19 AM
Groundwork8/27/20048/27/20048/27/2004APART
DetailsRon Ginner
main trunk line only with stubs up to grade.
Application received  8/26/2004  
Issue permit  8/26/2004 DONE