Water and/or Sewer | 11/10/2004 | 11/12/2004 | 11/12/2004 | A | PASS |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 11/10/2004 at 12:01:47 PM. Contact: ###-####.
|
DOC - Permit Finaled | 11/12/2004 | 11/12/2004 | 11/12/2004 | A | PASS |
Ron Ginner
|
|
|
Finaled by inspector at 11/12/2004 9:09:23 AM
|
Telephone call | | | 11/10/2004 | | DONE |
|
|
|
received fn cert of value $8695 no change
|
Water and/or Sewer | 9/23/2004 | 9/24/2004 | 9/24/2004 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/23/2004 at 4:09:20 PM. Contact: ###-####. first chamber vent and interceptor vent in pvc piping ok still need to intercepter piping to pvc and permit tap and have inspection by public work,s and provided backflow protection for existing yard hydrant 9/24/2004 11:44:01 AM
|
Plumbing Rough-in | 9/22/2004 | 9/23/2004 | 9/23/2004 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 9/22/2004 at 3:01:15 PM. Contact: ###-####. move upstream interceptor vent to 1st chamber, abs still needs to be removed from inside interceptor. 9/23/2004 8:34:48 AM
|
Water and/or Sewer | 9/16/2004 | 9/17/2004 | 9/17/2004 | A | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 9/16/2004 at 4:03:27 PM. Contact: ###-####. need to repipe interceptor with pvc and provide first chamber vent and down stream vent to be done by licensed plumber also need to pull sewer tap permit and have inspection by public works will also need to camera sewer line from interceptor to manhole will need to provid backflow pervention for water out to building talked to excavator from big bite excavation on job site will recall when ready 9/17/2004 12:21:58 PM
|
Application received | | | 9/14/2004 | | |
|
|
|
|
Issue permit | | | 9/14/2004 | | DONE |
|
|
|
|