Final | 5/1/2005 | 5/2/2005 | 5/2/2005 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/1/2005 at 8:23:57 PM. Contact: ###-####. final ok
|
Plumbing Rough-in | 3/10/2005 | 3/10/2005 | 3/10/2005 | P | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 3/10/2005 at 7:32:09 AM. Contact: ###-####. ri ok 3/10/2005 10:47:23 AM
|
Plumbing Rough-in | 3/9/2005 | 3/9/2005 | 3/10/2005 | P | PART |
Ron Ginner
|
|
|
informed plumber to change pvc couplings to shielded couplings. has abs glued to pvc with all pupose glue in master bath lavs.
|
Plumbing Rough-in | 3/8/2005 | 3/9/2005 | 3/9/2005 | A | PART |
Ron Ginner
|
|
|
Scheduled by a contractor via Hello! on 3/8/2005 at 10:18:40 PM. Contact: ###-####.
|
Application received | | | 3/3/2005 | | |
|
|
|
|
Issue permit | | | 3/3/2005 | | DONE |
|
|
|
|