Final | 7/6/2005 | 7/6/2005 | 7/6/2005 | P | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 7/6/2005 at 8:11:09 AM. Contact: ###-####.
|
Plumbing Rough-in | 6/1/2005 | 6/1/2005 | 6/1/2005 | A | PASS |
Jim Johnson
|
|
|
|
Plumbing Rough-in | 5/31/2005 | 5/31/2005 | 5/31/2005 | P | FAIL |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/31/2005 at 8:21:49 AM. Contact: ###-####. upc 706.2 need to change 3 inch cross to an approved double fixture fitting or repire with double san tee with a barrel size two sizes larger than the largest inle
|
Application received | | | 5/25/2005 | | |
|
|
|
|
Issue permit | | | 5/25/2005 | | DONE |
|
|
|
|