Final | 10/21/2005 | 10/24/2005 | 10/24/2005 | A | PASS |
Daryl Spivey
|
|
|
Scheduled by a contractor via Hello! on 10/21/2005 at 3:12:32 PM. Contact: ###-####.
|
Plumbing Rough-in | 8/8/2005 | 8/8/2005 | 8/8/2005 | P | PASS |
Gary Ziegler
|
|
|
Scheduled by a contractor via Hello! on 8/8/2005 at 7:38:10 AM. Contact: ###-####.
|
Plumbing Rough-in | 8/3/2005 | 8/3/2005 | 8/3/2005 | P | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/3/2005 at 7:51:12 AM. Contact: ###-####. water to washer in 2x4 outside wall, no hard to ks, check hosebibs.
|
Plumbing Rough-in | 8/2/2005 | 8/2/2005 | 8/2/2005 | P | FAIL |
Bill VanDegrift
|
|
|
###-#### aaron provide a water softenor loop, drain, and hard water to kitchen sink, and hosebibs. move washer box out of 2x4 exterior wall.
|
Issue permit | | | 8/2/2005 | | DONE |
|
|
|
|
Application received | | | 8/2/2005 | | |
|
|
|
|