Final | 5/3/2006 | 5/3/2006 | 5/3/2006 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/3/2006 at 7:30:15 AM. Contact: ###-####.
|
Water and/or Sewer | 5/1/2006 | 5/2/2006 | 5/1/2006 | A | FAIL |
Bill VanDegrift
|
|
|
Ready for re-inspection at any time. Please call the homeowner, Mark German @ ###-####, for access. Thanks!; Phone #: ###-#### Internet Inspection Request from: Jannette Soden needs 1" clearance to combustables at flue/ ceiling. tee for water heater connector has been damaged, flue flex connector is too long, needs to be as short as possable and graded 1/4" per foot.
|
Plumbing Rough-in | 4/26/2006 | 4/26/2006 | 4/26/2006 | P | PASS |
Bill VanDegrift
|
|
|
\###-#### just needs t&p piped to the floor
|
Issue permit | | | 4/26/2006 | | DONE |
|
|
|
|
Application received | | | 4/26/2006 | | |
|
|
|
|