Information based on query as of Friday, July 19, 2024.
Permit Information
Permit NumberPLM06-03063
StatusFinaled
Name TAPANI PLUMBING INC
Site Address 5850 N FIVE MILE RD
Project NameBONAVENTURE PLACE
Customer Number 
ePlanReview 
Description
plumb waste, drain, vent, gas per initial cert of value $403,617.66
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice PLM10/4/200710/4/200710/17/2007 DONE
First Notice has not been responded to.
First Notice8/29/20078/29/200710/4/2007 DONE
DetailsEric Strole
Final8/28/20078/29/20078/29/2007APASS
DetailsEric Strole
Water and/or Sewer8/28/20078/29/20078/28/2007ACANC
DetailsEric Strole
Please inspect for final at D-wing. Phone #: ###-#### Internet Inspection Request from: Carl Homola
Final8/22/20078/23/20078/23/2007APART
DetailsEric Strole
Please inspect final for D-wing. Thanks. Phone #: ###-#### Internet Inspection Request from: Carl Homola-need to install hbv's on boiler bibs in mech room. need all fixtures installed. temp ok.
PLM-Aging Inspection8/3/20078/3/20078/3/2007 NR
DetailsEric Strole
wip
Other5/31/20076/1/20076/1/2007ADONE
DetailsEric Strole
Please see foreman for consultation in D-wing. Thank you. Phone #: ###-#### Internet Inspection Request from: Carl Homola-this was a conferance on running a drain for a dishwasher in a island, will run drain in drop ceiling to kitchen sink.
Plumbing Rough-in5/17/20075/17/20075/17/2007PPASS
DetailsEric Strole
d-wing rough-in complete.
Plumbing Rough-in5/16/20075/17/20075/17/2007APART
DetailsEric Strole
missing some nail plates, isolators, supports on pex, curved pex stub outs & 1/2" copper line in w/h room.
Plumbing Rough-in5/16/20075/16/20075/16/2007PPART
DetailsEric Strole
Please inspect partial D-wing rough-in. Thankyou. Phone #: ###-#### Internet Inspection Request from: Carl Homola-all dwv in d-wing pass.all roof drains pass.
Plumbing Rough-in5/14/20075/15/20075/15/2007PCANC
DetailsEric Strole
Please inspect partial D-wing rough-in. Thankyou. Phone #: ###-#### Internet Inspection Request from: Carl Homola
Water and/or Sewer5/11/20075/11/20075/11/2007PNR
DetailsEric Strole
Please inspect partial D-wing this afternoon if possible. Thankyou. Phone #: ###-#### Internet Inspection Request from: Carl Homola
Plumbing Rough-in5/9/20075/10/20075/10/2007PPART
DetailsEric Strole
Please inspect partial D-wing rough-in. Thankyou. Phone #: ###-#### Internet Inspection Request from: Carl Homola-2nd leg d-wing dwv pass- all roof drains d-wing pass.
Plumbing Rough-in5/8/20075/9/20075/9/2007APART
DetailsEric Strole
Please inspect partial D-wing top-out. Thankyou. Phone #: ###-#### Internet Inspection Request from: Carl Homola-1st leg of d-wing dwv pass.
PLM-Aging Inspection4/24/20074/24/20074/24/2007 NR
DetailsEric Strole
wip
Water and/or Sewer2/21/20072/22/20072/22/2007APART
DetailsBill VanDegrift
Please inspect riser room rough-in (near D-wing). Thanks. Phone #: ###-####added rain drain riser between area B andC and relocated 6" p-trap in fire riser room. ok.
Groundwork1/11/20071/12/20071/12/2007APART
DetailsEric Strole
3" grease line under electrical room & stub out to intersepter ok to cover,still needs to air test under slab work as per conversation with jason & job forman.
Plumbing Rough-in1/11/20071/11/20071/11/2007PPART
DetailsEric Strole
Please inspect D-wing underground - will be ready at 10 or 11 AM if you''re available. Thank you! Phone #: ###-####-need to bed ground work & test.
PLM-Aging Inspection12/5/200612/5/200612/5/2006 NR
DetailsEric Strole
wip
Groundwork10/5/200610/5/200610/5/2006PPASS
DetailsEric Strole
Please inspect partial underground of D-wing this afternoon. Thanks!; Phone #: ###-#### Internet Inspection Request from: Carl Homola-D building ground work complete.
Groundwork10/3/200610/3/200610/3/2006PPART
DetailsEric Strole
the east & north end ground work ok.
Groundwork9/29/20069/29/20069/29/2006PCANC
DetailsEric Strole
Groundwork9/29/20069/29/20069/29/2006AFAIL
DetailsEric Strole
change out 8x4 pvc y,a pvc patch is not approved to fix hole in fitting-change mission bands to no-hub or fernco-test ground work-remove rocks in trench.
Groundwork9/20/20069/20/20069/20/2006PPART
DetailsEric Strole
A wing ground work complete.
Plumbing Rough-in9/20/20069/20/20069/20/2006PCANC
DetailsEric Strole
Please inspect partial A-wing underslab.; Phone #: ###-#### Internet Inspection Request from: Carl Homola
Plumbing Rough-in9/19/20069/20/20069/20/2006APART
DetailsJim Johnson
Please inspect parital A-wing underground tomorrow AM; Phone #: ###-#### Internet Inspection Request from: Carl Homola need to correct leak in Y at end of line clean out and retest
Groundwork9/12/20069/13/20069/13/2006PPART
DetailsEric Strole
Please inspect partial underslab A/B-wing. Thanks.; Phone #: ###-#### Internet Inspection Request from: Carl Homola-east end a building ground work ok.
Application received  9/11/2006  
Issue permit  9/11/2006 DONE
(F) Reprint permit  9/11/2006 DONE
Third Notice PLM10/17/200710/17/2007   
Second Notice has not been responded to.