Second Notice PLM | 7/23/2007 | 7/23/2007 | 8/3/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 2/9/2007 | 2/9/2007 | 7/23/2007 | | DONE |
Eric Strole
|
|
|
|
Sprinkler (Final) | 2/9/2007 | 2/9/2007 | 2/9/2007 | A | PASS |
Eric Strole
|
|
|
|
Sprinkler (Final) | 2/8/2007 | 2/8/2007 | 2/8/2007 | P | FAIL |
Eric Strole
|
|
|
need shut off valve before drain down valve.
|
Other | 12/20/2006 | 12/21/2006 | 12/21/2006 | A | FAIL |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 12/20/2006 at 2:56:48 PM. Contact: ###-####.exspose work for inspection.
|
Application received | | | 12/20/2006 | | |
|
|
|
|
Issue permit | | | 12/20/2006 | | DONE |
|
|
|
|