First Notice | 4/16/2007 | 4/16/2007 | 4/23/2007 | | DONE |
Bill VanDegrift
|
|
|
This permit finaled on the web by KYLIE HICKS
|
Final | 4/16/2007 | 4/16/2007 | 4/16/2007 | P | PASS |
Bill VanDegrift
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Stacie Backus no card on job
|
Other | 3/7/2007 | 3/8/2007 | 3/8/2007 | A | PART |
Eric Strole
|
|
|
conference Eric; Phone #: ###-#### Internet Inspection Request from: Stacie Backus-this was a walk thru with mike from buss, install dbca on building supply, isolate mech rooms with rpba, cap off all open drains, install hvb's on all hosebibs & boiler bibs, install exspantion tank, install rpba or delete hose for ?. label all non potible water, have all devices tested & certifed.
|
Final | 3/6/2007 | 3/7/2007 | 3/7/2007 | A | PART |
Eric Strole
|
|
|
JOB CONTACT: HENRY FORSCHLER, PHONE#:###-#### Phone #: ###-####-need to install rp in boiler room, need dc on service, need hvb on all hosebibs, bath final pass.
|
Plumbing Rough-in | 2/16/2007 | 2/20/2007 | 2/20/2007 | A | PASS |
Bill VanDegrift
|
|
|
JOB CONTACT: AB JENSEN ###-#### Phone #: ###-#### ri ok
|
Groundwork | 1/2/2007 | 1/2/2007 | 1/2/2007 | P | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 1/2/2007 | 1/2/2007 | 1/2/2007 | P | PASS |
Eric Strole
|
|
|
please contact Henry; Phone #: ###-#### Internet Inspection Request from: John Buss
|
Owner Supplied Equipment | | | 1/2/2007 | | |
|
|
|
|
Application received | | | 1/2/2007 | | DONE |
|
|
|
This permit was created on the web by John Buss
|