Final | 10/4/2007 | 10/5/2007 | 10/5/2007 | P | PASS |
Bill VanDegrift
|
|
|
dave Note: after lunch please Phone #: ###-#### final ok with disposal dish washer drain connection plugged. talked to builder and he will see that it is done.
|
Plumbing Rough-in | 4/27/2007 | 4/30/2007 | 4/30/2007 | A | PASS |
Bill VanDegrift
|
|
|
dave ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ri ok
|
Plumbing Rough-in | 4/18/2007 | 4/18/2007 | 4/18/2007 | P | FAIL |
Bill VanDegrift
|
|
|
Dave; Phone #: ###-#### Internet Inspection Request from: Stacie Backus san cross prohibited on back to back toilets, vent master shower. use shielded transition coupling at waste branch/ building drain. continous vent required on toilet in utility room. bushing on 2" cross drain outlet prohibited.
|
Plumbing Rough-in | 4/10/2007 | 4/11/2007 | 4/11/2007 | P | FAIL |
Eric Strole
|
|
|
Dave; Phone #: ###-#### Internet Inspection Request from: Stacie Backus-no changes made.
|
Plumbing Rough-in | 4/4/2007 | 4/5/2007 | 4/5/2007 | A | FAIL |
Daryl Spivey
|
|
|
Dave; Phone #: ###-#### Internet Inspection Request from: Stacie Backus Change waste and vent to bring up to code, shower valve in outside wall, water closet and bidet needs to be 15" center to center, nail plate and retest.....ds
|
Application received | | | 2/23/2007 | | |
|
|
|
|
Issue & PRINT permit | | | 2/23/2007 | | DONE |
|
|
|
|