Final | 9/21/2007 | 9/24/2007 | 9/24/2007 | A | PASS |
Eric Strole
|
|
|
ken Phone #: ###-####
|
Final | 9/19/2007 | 9/19/2007 | 9/19/2007 | P | PEND |
Eric Strole
|
|
|
ken Phone #: ###-####-t & p needs to be 3/4 " & run to an approved location.
|
Plumbing Rough-in | 5/10/2007 | 5/10/2007 | 5/10/2007 | P | PASS |
Jim Johnson
|
|
|
ken; Phone #: ###-#### Internet Inspection Request from: Victoria Beall NOTE above floor rough-in test ok going to pass so home owner can proceed with work above floor still need to make correction on DWV drainage under floor inspector 380 will check on final as per conversation with Eric
|
Plumbing Rough-in | 5/4/2007 | 5/7/2007 | 5/7/2007 | A | FAIL |
Eric Strole
|
|
|
ken ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith-need to test dwv & water, need to use drainage fittings in crawl, nail plate, support dwv every 4'- remove metal straps from pex, shower valve needs to be pressure balance.
|
Issue PAID IN FULL permit | | | 3/13/2007 | | DONE |
|
|
|
|
Application received | | | 3/13/2007 | | |
|
|
|
|