Third Notice PLM | 8/16/2007 | 8/16/2007 | 8/31/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice PLM | 7/23/2007 | 7/23/2007 | 8/16/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 5/31/2007 | 5/31/2007 | 7/23/2007 | | DONE |
Eric Strole
|
|
|
|
Final | 5/30/2007 | 5/31/2007 | 5/31/2007 | A | PASS |
Eric Strole
|
|
|
laurie; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
Plumbing Rough-in | 4/16/2007 | 4/17/2007 | 4/17/2007 | P | PASS |
Jim Johnson
|
|
|
Lori ; Phone #: ###-####5 Internet Inspection Request from: Darla Downs
|
Plumbing Rough-in | 4/16/2007 | 4/16/2007 | 4/16/2007 | P | PART |
Jim Johnson
|
|
|
lorie ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith need to move water pex piping from can light in far west unit called contractor will recall when ready
|
Plumbing Rough-in | 4/12/2007 | 4/12/2007 | 4/12/2007 | P | FAIL |
Jim Johnson
|
|
|
Peras; Phone #: ###-#### Units 5241, 5249,5245, 5251 Internet Inspection Request from: Stacie Backus 1 need to move pex water piping 6 inch,s horizontal or 12 inches vertical from can light,s in all units 2 support abs every 4 feet where needed 3 support pex every 32 inches where needed 4 need to add fixtures to permit 4-clothes washer and 4 water softner rough-in,s note DWV test ok left correction notice on job site
|
Issue permit | | | 4/12/2007 | | DONE |
|
|
|
|
Application received | | | 4/12/2007 | | |
|
|
|
|