Plumbing Rough-in | 4/18/2007 | 4/19/2007 | 4/19/2007 | A | PASS |
Daryl Spivey
|
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
Plumbing Rough-in | 4/17/2007 | 4/17/2007 | 4/17/2007 | P | FAIL |
Bill VanDegrift
|
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Darla Downs reduction of existing 4" horizontal waste to 3" is prohibited. kitchen sink vent must be 6" above tub rin before connecting. nail plate kitchen sink vent and tub waste at wall top plate.
|
Application received | | | 4/16/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/16/2007 | | |
|
|
|
|