Telephone call | | | 11/7/2007 | | DONE |
|
|
|
Roy Marlin with Better Mechanical called to let you know there was no change in value on plm07-01479 & mec07-01851. The address is 9050 w overland #130 if you have any questions you can call him at ###-####
|
Telephone call | | | 11/6/2007 | | DONE |
|
|
|
tlkt o better mech regarding the difference between them and contractor - they said that marty will call me back 12:15 pm
|
Second Notice PLM | 8/16/2007 | 8/16/2007 | 9/28/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 7/20/2007 | 7/20/2007 | 8/16/2007 | | DONE |
Bill VanDegrift
|
|
|
|
Final | 7/19/2007 | 7/20/2007 | 7/20/2007 | A | PASS |
Bill VanDegrift
|
|
|
Roy; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
Final | 7/17/2007 | 7/17/2007 | 7/17/2007 | P | PART |
Jim Johnson
|
|
|
roy Phone #: ###-#### need to finish trim in drive through area oked temp.
|
Final | 7/12/2007 | 7/13/2007 | 7/13/2007 | P | PART |
Eric Strole
|
|
|
roy ###-####-need union on rpba in mech room, exspresso & coffee & dishwasher need rpba's, need tempered water to public lav's & hand sinks.
|
Plumbing Rough-in | 6/28/2007 | 6/28/2007 | 6/29/2007 | P | FAIL |
Bill VanDegrift
|
|
|
roy - re-inspection Phone #: ###-#### expose interceptor upstream piping, downstream piping ok to cover. tank test ok
|
Water and/or Sewer | 6/29/2007 | 6/29/2007 | 6/29/2007 | A | PART |
Bill VanDegrift
|
|
|
roy - re-inspection Phone #: ###-#### interceptor and piping ok
|
Plumbing Rough-in | 6/25/2007 | 6/25/2007 | 6/25/2007 | P | FAIL |
Eric Strole
|
|
|
roy Phone #: ###-####-grease interseptor needs tested,needs test port,needs 4" 0n downstream side,fix backgrade on inlet side,uncover work for inspection.
|
Other | 5/24/2007 | 5/25/2007 | 5/25/2007 | A | PART |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 5/24/2007 at 5:01:14 PM. Contact: ###-####. this was a gas test the 60# was ok but the 20# side needs to be piped into the fireplace and retested, a mec permit is pending
|
Plumbing Rough-in | 5/23/2007 | 5/23/2007 | 5/23/2007 | P | PASS |
Jim Johnson
|
|
|
roy - re-inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
Plumbing Rough-in | 5/21/2007 | 5/22/2007 | 5/22/2007 | A | PART |
Jim Johnson
|
|
|
Scheduled by a contractor via Hello! on 5/21/2007 at 7:51:36 PM. need to complete water system as per plan,s
|
Plumbing Rough-in | 5/18/2007 | 5/21/2007 | 5/21/2007 | P | NR |
Jim Johnson
|
|
|
roy; Phone #: ###-#### Internet Inspection Request from: Victoria Beall not ready contractor to recall when ready
|
Plumbing Rough-in | 5/3/2007 | 5/4/2007 | 5/4/2007 | A | PART |
Eric Strole
|
|
|
roy - groundwork; Phone #: ###-#### Internet Inspection Request from: Victoria Beall-missing plumbing page on approved plans.this was a ground work, pass as long as the same as plans.
|
Application received | | | 5/3/2007 | | |
|
|
|
|
Issue permit | | | 5/3/2007 | | DONE |
|
|
|
|