First Notice | 8/17/2007 | 8/17/2007 | 9/18/2007 | | DONE |
Jim Johnson
|
|
|
This permit finaled on the web by Heidi Mallet
|
Final | 8/17/2007 | 8/17/2007 | 8/17/2007 | P | PASS |
Jim Johnson
|
|
|
scott Phone #: ###-#### note no sign-off card on site
|
Final | 8/16/2007 | 8/16/2007 | 8/16/2007 | P | FAIL |
Jim Johnson
|
|
|
SCOTT Phone #: ###-#### 1. need to have double check tested and certified 2. need to caulk mop sink at wall and floor also need strainer for mop sink .3. caulk drinking fountain at wall. 4. need open front seat,s on water closet,s in restroom,s 5. power up water heater and adjust faucet,s in restroom,s for 120 degree hot water limitation if needed
|
Plumbing Rough-in | 6/18/2007 | 6/19/2007 | 6/19/2007 | A | PASS |
Eric Strole
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
Plumbing Rough-in | 6/15/2007 | 6/18/2007 | 6/18/2007 | A | FAIL |
Bill VanDegrift
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang need boise mountain eye care approved plans. tests are ok.
|
Plumbing Rough-in | 5/31/2007 | 5/31/2007 | 5/31/2007 | P | PEND |
Eric Strole
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Darla Downs-no inspection till building permit is issued & approved plans are on site.
|
Plumbing Rough-in | 5/30/2007 | 5/31/2007 | 5/31/2007 | A | NR |
Eric Strole
|
|
|
scott; Phone #: ###-#### Internet Inspection Request from: Victoria Beall-need to be under t/i permit under t/i building permit.
|
Application received | | | 5/24/2007 | | DONE |
|
|
|
This permit was created on the web by Josh Bennett
|