First Notice | 12/17/2008 | 12/17/2008 | 1/19/2009 | | DONE |
Jim Johnson
|
|
|
This permit finaled on the web by joe paige
|
Final | 12/17/2008 | 12/17/2008 | 12/17/2008 | A | PASS |
Jim Johnson
|
|
|
Please contact Darren with any quesitons. Phone #: ###-#### Internet Inspection Request from: Diane Houst
|
PLM-Aging Inspection | 11/24/2008 | 11/24/2008 | 11/24/2008 | | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 9/22/2008 | 9/22/2008 | 9/22/2008 | | PASS |
Jim Johnson
|
|
|
no request for final
|
Other | 7/17/2008 | 7/21/2008 | 7/21/2008 | A | PASS |
Jim Johnson
|
|
|
have the roof drains been tested & inspected & waterline inspection. rough-in for dwv & water pass.check few nailplates missing.
|
Plumbing Rough-in | 7/17/2008 | 7/17/2008 | 7/17/2008 | P | PART |
Eric Strole
|
|
|
Please call Claude at # given Phone #: ###-#### Internet Inspection Request from: Diane Houst-rough-in on dwv & water pass.
|
Plumbing Rough-in | 6/10/2008 | 6/11/2008 | 6/11/2008 | A | CANC |
Jim Johnson
|
|
|
Call Darren please. This is a second floor under floor rough in inspection. Phone #: ###-#### Internet Inspection Request from: joe paige
|
Plumbing Rough-in | 5/14/2008 | 5/15/2008 | 5/15/2008 | A | PART |
Jim Johnson
|
|
|
Call Darren please Phone #: ###-#### Internet Inspection Request from: joe page this inspection is for rest room,s in warehouse area on north wall test ok ok to cover restroom,s in office area to be done at later date
|
PLM-Aging Inspection | 4/14/2008 | 4/14/2008 | 4/14/2008 | | PASS |
Jim Johnson
|
|
|
under construction
|
Water and/or Sewer | 2/10/2008 | 2/11/2008 | 2/11/2008 | P | PART |
Jim Johnson
|
|
|
all Darren please Phone #: ###-#### Internet Inspection Request from: joe paige visual on water line and sprinkler tie in still need to test
|
Groundwork | 2/8/2008 | 2/11/2008 | 2/10/2008 | A | CANC |
Jim Johnson
|
|
|
Call Darren please Phone #: ###-#### Internet Inspection Request from: joe paige Inspection cancelled from web by: joe paige
|
PLM-Aging Inspection | 1/21/2008 | 1/21/2008 | 1/22/2008 | | PASS |
Jim Johnson
|
|
|
|
Groundwork | 11/20/2007 | 11/20/2007 | 11/20/2007 | P | PASS |
Jim Johnson
|
|
|
Call Darren please if you have questions. Sample port is installed, the tank is full of water and the lid is off. Phone #: ###-#### Internet Inspection Request from: joe paige interceptor and pipining test ok
|
Groundwork | 10/16/2007 | 10/17/2007 | 10/17/2007 | A | PART |
Jim Johnson
|
|
|
Gas and sand trap ...........Call Darren please Phone #: ###-#### Internet Inspection Request from: joe paige need first chamber vent in interceptor need sampling port on down stream side of interceptor need to pull water tight lid to confirm tank is full of water for test on tank called contractor will recall when ready
|
PLM-Aging Inspection | 10/10/2007 | 10/12/2007 | 10/12/2007 | A | PASS |
Jim Johnson
|
|
|
no request for rough-in
|
PLM-Aging Inspection | 10/10/2007 | 10/10/2007 | 10/10/2007 | | CANC |
Lee Rice
|
|
|
|
Groundwork | 8/10/2007 | 8/10/2007 | 8/10/2007 | P | PASS |
Eric Strole
|
|
|
sanitary dwv pass.
|
Groundwork | 8/9/2007 | 8/10/2007 | 8/10/2007 | A | FAIL |
Eric Strole
|
|
|
Call Claude please Phone #: ###-#### Internet Inspection Request from: joe paige-dwv test failed, bed all piping, fix flat & reverse grade on dwv, wrap ALL piping that will be in concrete, have approved plans on site.
|
Application received | | | 8/9/2007 | | DONE |
|
|
|
This permit was created on the web by joe paige
|