Telephone call | | | 9/12/2008 | | DONE |
|
|
|
lft vm with joe regarding final value differences from contractors - 4th and final call 9:45 am
|
Telephone call | | | 7/14/2008 | | DONE |
|
|
|
lft ms with secretary ###-#### regarding the final values
|
Telephone call | | | 5/14/2008 | | DONE |
|
|
|
tlk to joe on the ###-#### to verify the difference of final value 9:10 am
|
Telephone call | | | 3/31/2008 | | DONE |
|
|
|
tlk to Mr Paige ###-#### 2:30 to verify the final value from theirs to contractors
|
First Notice | 12/13/2007 | 12/13/2007 | 3/16/2008 | | DONE |
Gerry Varner
|
|
|
This permit finaled on the web by joe paige
|
Final | 12/12/2007 | 12/12/2007 | 12/13/2007 | P | PASS |
Gerry Varner
|
|
|
Call Darren please Phone #: ###-#### Internet Inspection Request from: joe paige
|
PLM-Aging Inspection | 11/19/2007 | 11/19/2007 | 11/19/2007 | | PASS |
Bill VanDegrift
|
|
|
no calls
|
Final | 9/14/2007 | 9/17/2007 | 9/17/2007 | A | PART |
Daryl Spivey
|
|
|
10am need to have plg. contr. install all equip attached to plg, test and certify bldg dcva....ds
|
Plumbing Rough-in | 9/13/2007 | 9/14/2007 | 9/14/2007 | P | FAIL |
Eric Strole
|
|
|
Call Darren please. This is a final inspection for a rough in only job. Thanks Phone #: ###-#### Internet Inspection Request from: joe paige.changed inspection for monday mourning before they open for buisness.need to check for premis protection, other backflow devices may be required,need hot & cold lines with shut off valves to sinks in sushi area.
|
Plumbing Rough-in | 9/13/2007 | 9/13/2007 | 9/13/2007 | A | CANC |
Gerry Varner
|
|
|
Call Darren please. This is a rough only job. Please final Phone #: ###-#### Internet Inspection Request from: joe paige Inspection cancelled from web by: joe paige
|
Application received | | | 9/13/2007 | | DONE |
|
|
|
This permit was created on the web by joe paige
|