First Notice | 6/2/2008 | 6/2/2008 | 11/20/2008 | | DONE |
Bill VanDegrift
|
|
|
|
Telephone call | | | 11/19/2008 | | DONE |
|
|
|
lft vm with performance about the final values for the mech and plm 4:40 pm
|
Telephone call | | | 9/30/2008 | | DONE |
|
|
|
tlk to performance regarding the value for both the plm and mech 2:15 pm
|
Final | 6/2/2008 | 6/2/2008 | 6/2/2008 | P | PASS |
Bill VanDegrift
|
|
|
aaron Phone #: ###-#### final ok
|
Groundwork | 4/28/2008 | 4/29/2008 | 4/29/2008 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 4/28/2008 at 9:58:35 PM. Contact: ###-####.-lift station pass
|
PLM-Aging Inspection | 3/20/2008 | 3/20/2008 | 3/21/2008 | | PASS |
Eric Strole
|
|
|
wip
|
Plumbing Rough-in | 1/18/2008 | 1/18/2008 | 1/18/2008 | P | PASS |
Eric Strole
|
|
|
Aaron ###-####
|
Plumbing Rough-in | 1/10/2008 | 1/10/2008 | 1/10/2008 | P | NR |
Eric Strole
|
|
|
aaron Phone #: ###-####
|
DOC - Permit Finaled | 1/10/2008 | 1/10/2008 | 1/10/2008 | P | PASS |
Eric Strole
|
|
|
aaron Phone #: ###-####
|
CHANGE STATUS TO (I) | | | 1/10/2008 | | DONE |
|
|
|
error not to final
|
Plumbing Rough-in | 12/3/2007 | 12/3/2007 | 12/3/2007 | P | PART |
Eric Strole
|
|
|
AARON Phone #: ###-####-need to finish nailplates, support dwv every 4', fix reverse grade on overhead vents & 1 1/2" overhead drain, move water lines from exteriour wall, raise avb's in both buildings to be 6" above fixture, fix fitting on vent thats in backwards, ok to pull test.(need access to avb's)
|
Application received | | | 11/15/2007 | | |
|
|
|
|
Issue permit | | | 11/15/2007 | | DONE |
|
|
|
|