Telephone call | | | 11/19/2008 | | DONE |
|
|
|
lft vm with performance about the final values for the mech and plm 4:40 pm
|
Telephone call | | | 9/30/2008 | | DONE |
|
|
|
tlk to performance regarding the value for both the plm and mech 2:15 pm
|
Second Notice PLM | 6/9/2008 | 6/9/2008 | 6/11/2008 | | DONE |
Darla L Downs
|
|
|
First Notice has not been responded to.
|
First Notice | 5/22/2008 | 5/22/2008 | 6/9/2008 | | DONE |
Eric Strole
|
|
|
|
Final | 5/22/2008 | 5/22/2008 | 5/22/2008 | P | PASS |
Eric Strole
|
|
|
aaron Phone #: ###-####
|
Groundwork | 4/28/2008 | 4/29/2008 | 4/29/2008 | A | PASS |
Eric Strole
|
|
|
Scheduled by a contractor via Hello! on 4/28/2008 at 9:56:41 PM. Contact: ###-####. lift station pass.
|
Other | 4/8/2008 | 4/8/2008 | 4/8/2008 | P | DONE |
Eric Strole
|
|
|
this was to check on an aging inspection, waiting for lift stations to be delivered.
|
PLM-Aging Inspection | 4/8/2008 | 4/8/2008 | 4/8/2008 | | PASS |
Eric Strole
|
|
|
|
Other | 2/6/2008 | 2/7/2008 | 2/7/2008 | A | DONE |
Eric Strole
|
|
|
lift station plans-droped off approved lift station drawings.
|
PLM-Aging Inspection | 1/25/2008 | 1/25/2008 | 1/25/2008 | | PASS |
Eric Strole
|
|
|
|
Plumbing Rough-in | 11/21/2007 | 11/23/2007 | 11/23/2007 | P | PASS |
Eric Strole
|
|
|
Aaron Phone #: ###-####
|
Application received | | | 11/15/2007 | | |
|
|
|
|
Issue permit | | | 11/15/2007 | | DONE |
|
|
|
|