PLM-Aging Inspection | 7/6/2009 | 7/6/2009 | 7/6/2009 | | PASS |
Jim Johnson
|
|
|
|
DOC - Permit Expired | 7/6/2009 | 7/5/2009 | 7/6/2009 | P | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 5/4/2009 | 5/4/2009 | 5/5/2009 | | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 3/2/2009 | 3/2/2009 | 3/2/2009 | | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 12/30/2008 | 12/30/2008 | 12/30/2008 | | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 10/29/2008 | 10/29/2008 | 10/29/2008 | | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 8/27/2008 | 8/27/2008 | 8/28/2008 | | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 6/18/2008 | 6/18/2008 | 6/18/2008 | | PASS |
Jim Johnson
|
|
|
|
PLM-Aging Inspection | 4/17/2008 | 4/17/2008 | 4/17/2008 | | PASS |
Jim Johnson
|
|
|
still need to make correction for cross control
|
Final | 2/13/2008 | 2/13/2008 | 2/13/2008 | A | PART |
Jim Johnson
|
|
|
made walk through with Bill T, FROM united water ( water preveyer ) need to correct the following as per cross control connection manual 6 th edition and water perveyer,s requirment,s and upc 2003 101.5.2, 104.1.2, 101.1.3, and 603, 602 to protect potable water system in building 1. need to have existing main premise protection and existing PVB tested and certified. 2. need R.P. installed on wash & rinse sanitize machine. 3. need R.P. for proofer & steamer in bakery area. 4. need to isolate coffee & expresso machine with R.P. and install D.C. on ice machine in coffee area. 5. need D.C. on ice making machine at front entrance west side of store 6. need D.C. installed on water supply to produce case. 7. need to provide designated water supply to chemical supply system located in back of store.by mop sink. gave copy of correction notice to plumbing contractor
|
Final | 2/4/2008 | 2/5/2008 | 2/5/2008 | A | PART |
Jim Johnson
|
|
|
JOB CONTACT IS HENRY Phone #: ###-#### Internet Inspection Request from: ADAM WARR need to make a walk through with Bill T. WITH united water to see if any additional backflow protection in building will be needed oking temp on final
|
Final | 2/4/2008 | 2/5/2008 | 2/4/2008 | P | CANC |
Jim Johnson
|
|
|
JOB CONTACT IS HENRY Phone #: ###-#### Internet Inspection Request from: ADAM WARR Inspection cancelled from web by: ADAM WARR
|
Final | 2/1/2008 | 2/4/2008 | 2/4/2008 | P | CANC |
Jim Johnson
|
|
|
JOB CONTACT IS HENRY Phone #: ###-#### Internet Inspection Request from: ADAM WARR Inspection cancelled from web by: ADAM WARR
|
Plumbing Rough-in | 1/14/2008 | 1/15/2008 | 1/15/2008 | A | PART |
Jim Johnson
|
|
|
PLEASE USE DAVE AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY in wall rough-in ok ok to cover
|
Groundwork | 1/9/2008 | 1/9/2008 | 1/9/2008 | P | PASS |
Jim Johnson
|
|
|
PLEASE USE DAVE AS CONTACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY
|
Groundwork | 1/8/2008 | 1/8/2008 | 1/8/2008 | P | FAIL |
Jim Johnson
|
|
|
PLEASE USE DAVE W. AS CONRACT, THANK YOU. Phone #: ###-#### Internet Inspection Request from: JENN STALEY test failed on DWV need to retest
|
Application received | | | 1/8/2008 | | DONE |
|
|
|
This permit was created on the web by JENN STALEY
|