Final | 6/17/2009 | 6/17/2009 | 6/17/2009 | P | PASS |
Daryl Spivey
|
|
|
Kevin ###-####//call for access info
|
Override - Parcel Holds | | | 6/17/2009 | | |
|
|
|
|
Plumbing Rough-in | 9/15/2008 | 9/16/2008 | 9/16/2008 | P | PASS |
Eric Strole
|
|
|
Phone #: ###-#### Internet Inspection Request from: KEVIN FRANKLIN
|
Groundwork | 8/26/2008 | 8/27/2008 | 8/27/2008 | A | PART |
Eric Strole
|
|
|
per eric strole-all dwv pass, contractor to recall when ready with the rest of the rough-in.
|
Override - Parcel Holds | 8/26/2008 | 1/1/1900 | 8/26/2008 | | |
|
|
|
for plm insp
|
Groundwork | 8/22/2008 | 8/25/2008 | 8/24/2008 | P | CANC |
Eric Strole
|
|
|
I would like an afternoon inspection.Thank you Phone #: ###-#### Internet Inspection Request from: KEVIN FRANKLIN Inspection cancelled from web by: KEVIN FRANKLIN
|
Application received | | | 8/22/2008 | | DONE |
|
|
|
This permit was created on the web by KEVIN FRANKLIN
|