Final | 5/19/2009 | 5/20/2009 | 5/20/2009 | P | PASS |
Jim Johnson
|
|
|
final after corrections made per inspection 5/18mike kelley ###-#### Phone #: ###-#### Internet Inspection Request from: Allison Briggs
|
Final | 5/15/2009 | 5/18/2009 | 5/18/2009 | A | PART |
Jim Johnson
|
|
|
final habitat homes Mike Kelly Local 296 will be point of contact on inspection ###-#### Phone #: ###-#### Internet Inspection Request from: Allison Briggs need to provide installation instruction on water heater may need to install T&p valve on water heater contractor to recall when ready
|
Plumbing Rough-in | 11/25/2008 | 11/26/2008 | 11/26/2008 | P | PASS |
Eric Strole
|
|
|
1:30
|
Other | 11/25/2008 | 11/25/2008 | 11/25/2008 | P | DONE |
Eric Strole
|
|
|
this was a conferance with plumbers about rough-in.
|
Other | 11/24/2008 | 11/25/2008 | 11/25/2008 | A | CANC |
Eric Strole
|
|
|
conferance-changed to pm
|
Water and/or Sewer | 10/21/2008 | 10/21/2008 | 10/21/2008 | P | PASS |
Eric Strole
|
|
|
|
Final | 10/20/2008 | 10/20/2008 | 10/20/2008 | P | FAIL |
Eric Strole
|
|
|
SEWER FINAL Phone #: ###-#### Internet Inspection Request from: Allison Briggs-water & sewer test failed.-need to use approved transition glue from abs to pvc.
|
Application received | | | 10/14/2008 | | DONE |
|
|
|
This permit was created on the web by Allison Briggs
|