Final | 1/7/2009 | 1/8/2009 | 1/7/2009 | A | PASS |
Bill VanDegrift
|
|
|
tim Phone #: ###-#### final ok will call when bar sink is installed
|
Plumbing Rough-in | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PASS |
Bill VanDegrift
|
|
|
TIM Phone #: ###-####
|
Plumbing Rough-in | 11/6/2008 | 11/6/2008 | 11/6/2008 | P | FAIL |
Bill VanDegrift
|
|
|
see the final inspection that was requested by mistake for comments.
|
Final | 11/6/2008 | 11/6/2008 | 11/6/2008 | P | FAIL |
Bill VanDegrift
|
|
|
tim Phone #: ###-#### waste and vent test west side failed. nail plate water softener loop back side of the wall. provide full port shutoff valve for the sump discharge.
|
CHANGE STATUS TO (I) | | | 11/6/2008 | | DONE |
Alexandra L. DeYoung
|
|
|
Bill finaled by mistake
|
Plumbing Rough-in | 11/5/2008 | 11/5/2008 | 11/5/2008 | P | NR |
Jim Johnson
|
|
|
tim Phone #: ###-#### not ready
|
Application received | | | 11/5/2008 | | |
|
|
|
|
Issue permit | | | 11/5/2008 | | DONE |
|
|
|
|