Final | 2/17/2009 | 2/18/2009 | 2/18/2009 | A | PASS |
Jim Johnson
|
|
|
Final trim. Contact = Kristy Watson. Phone #: ###-#### Internet Inspection Request from: Kristy Watson
|
Final | 2/10/2009 | 2/10/2009 | 2/10/2009 | P | FAIL |
Jim Johnson
|
|
|
tim Phone #: ###-#### need to have permit holder call for inspection .
|
Final | 2/4/2009 | 2/5/2009 | 2/5/2009 | A | FAIL |
Jim Johnson
|
|
|
tim Phone #: ###-#### need to pipe T&P drain line to an approved location left correction notice on site contractor to recall when ready
|
Plumbing Rough-in | 11/20/2008 | 11/21/2008 | 11/21/2008 | A | PASS |
Jim Johnson
|
|
|
Contact = Sandy Watson. Rough-In. Phone #: ###-#### Internet Inspection Request from: Kristy Watson
|
Groundwork | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | PASS |
Jim Johnson
|
|
|
|
Groundwork | 11/7/2008 | 11/7/2008 | 11/7/2008 | P | FAIL |
Jim Johnson
|
|
|
Groundwork inspection. Contact = Sandy Watson Phone #: ###-#### Internet Inspection Request from: Kristy Watson need to use approved material to make transition from PVC to ABS. TEST FAILED on DWV need to retest contractor to recall when ready
|
Application received | | | 11/7/2008 | | DONE |
|
|
|
This permit was created on the web by Kristy Watson
|