First Notice | 8/19/2009 | 8/19/2009 | 10/20/2009 | | DONE |
Eric Strole
|
|
|
This permit finaled on the web by joe paige
|
Groundwork | 8/18/2009 | 8/19/2009 | 8/19/2009 | A | PASS |
Eric Strole
|
|
|
|
DOC - Permit Finaled | 8/19/2009 | 8/19/2009 | 8/19/2009 | P | PASS |
Eric Strole
|
|
|
|
Final | 8/17/2009 | 8/18/2009 | 8/18/2009 | A | PART |
Eric Strole
|
|
|
Call Darren please Phone #: ###-#### Internet Inspection Request from: joe paige-need to have vent on sewer downstream of interceptor and outside vents need to be 10' above ground level and supported. start 24 hr test on interceptor.
|
Application received | | | 8/17/2009 | | DONE |
|
|
|
This permit was created on the web by joe paige
|