First Notice | 5/18/2010 | 5/18/2010 | 6/28/2010 | | DONE |
Bill VanDegrift
|
|
|
This permit finaled on the web by Sonja Hankel
|
Final | 5/18/2010 | 5/18/2010 | 5/18/2010 | A | PASS |
Bill VanDegrift
|
|
|
final ok with sink by blender washer supplied upstream of dcva talked to terry h
|
Final | 3/26/2010 | 3/26/2010 | 3/26/2010 | P | FAIL |
Bill VanDegrift
|
|
|
dcva required on the blender washer, all work to be preformed by a licensed plumbing contractor and properly permitted.
|
Final | 2/1/2010 | 2/1/2010 | 2/1/2010 | P | PART |
Bill VanDegrift
|
|
|
Please call Terry with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel dcva on the blender washer. will be moving faucetts around. will recall when complete.
|
Plumbing Rough-in | 1/25/2010 | 1/26/2010 | 1/26/2010 | A | PASS |
Daryl Spivey
|
|
|
Please call Terry with quetions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel restroom roughed in ok...........ds
|
Final | 1/25/2010 | 1/26/2010 | 1/26/2010 | A | PART |
Daryl Spivey
|
|
|
This is for a partial final. Please call Terry with quetions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel one bathroom on right side ok...........ds
|
Other | 1/22/2010 | 1/25/2010 | 1/25/2010 | A | PASS |
Bill VanDegrift
|
|
|
meet terry and bill t . bill will call with time correction notice for the ccc was issued. move premise protection to an accessable location. provide individual water supply for the chemical station at the mop sink. glass washer needs to have it's avb raised or install an r.p.. provide r.p. for the filtered water system. coffee makers need dcva. smoothie blender rinse needs to have it's dual check removed, install r.p.. r.p.'s on espresso.
|
Groundwork | 1/21/2010 | 1/22/2010 | 1/22/2010 | A | PART |
Bill VanDegrift
|
|
|
If questions call Terry @ ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel gw for the north restroom ok
|
Final | 1/22/2010 | 1/22/2010 | 1/22/2010 | A | PART |
Bill VanDegrift
|
|
|
If questions call Terry @ ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel terry wanted a final on the south restroom, it looked ok.
|
Groundwork | 12/3/2009 | 12/3/2009 | 12/3/2009 | P | PASS |
Daryl Spivey
|
|
|
Please call Mark with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel
|
Plumbing Rough-in | 12/3/2009 | 12/3/2009 | 12/3/2009 | P | PART |
Daryl Spivey
|
|
|
Please call Terry with questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel waste and vent tie ins ok.call back when water is done..........ds
|
Owner Supplied Equipment | | | 12/3/2009 | | |
|
|
|
|
Application received | | | 12/3/2009 | | DONE |
|
|
|
This permit was created on the web by Sonja Hankel
|