Sprinkler (Final) | 5/20/2010 | 5/20/2010 | 5/20/2010 | A | PASS |
Daryl Spivey
|
|
|
|
Sprinkler (Final) | 5/12/2010 | 5/12/2010 | 5/12/2010 | P | FAIL |
Daryl Spivey
|
|
|
needs a union within 12 inches of backflow.............ds
|
Application received | | | 5/11/2010 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/11/2010 | | DONE |
|
|
|
|