Final | 12/15/2010 | 12/16/2010 | 12/16/2010 | A | PASS |
Bill VanDegrift
|
|
|
Steve Phone #: ###-####
|
Water and/or Sewer | 12/16/2010 | 12/16/2010 | 12/16/2010 | A | CANC |
Bill VanDegrift
|
|
|
Steve Phone #: ###-####
|
Plumbing Rough-in | 11/10/2010 | 11/10/2010 | 11/10/2010 | P | PASS |
Bill VanDegrift
|
|
|
ri ok
|
Plumbing Rough-in | 11/9/2010 | 11/10/2010 | 11/10/2010 | A | PART |
Bill VanDegrift
|
|
|
steve Phone #: ###-#### needs valve secured and high density foam behind shower valve in the exterior wall.
|
Application received | | | 11/9/2010 | | |
|
|
|
|
Issue permit | | | 11/9/2010 | | DONE |
|
|
|
|