First Notice | 4/15/2011 | 4/15/2011 | 6/7/2011 | | DONE |
Jim Johnson
|
|
|
|
Final | 4/15/2011 | 4/15/2011 | 4/15/2011 | P | PASS |
Jim Johnson
|
|
|
|
Final | 4/12/2011 | 4/13/2011 | 4/13/2011 | A | PART |
Jim Johnson
|
|
|
>> Inspection requested via web by ron pierce need to provide indirect waste drain on food prep sink in back room call contractor will recall when ready
|
Final | 3/18/2011 | 3/18/2011 | 3/18/2011 | P | FAIL |
Jim Johnson
|
|
|
>> Inspection requested via web by ron pierce need to have all existing backflow devices tesdted and certified need to remove hose from mop sink faucet to chemical despencer and provide a seperate water supply protected with a reduce pressure back flow assembly ( R P ) to chemcial dispencer left correction notice on site contractor to recall when ready
|
Plumbing Rough-in | 2/24/2011 | 2/25/2011 | 2/25/2011 | P | PASS |
Jim Johnson
|
|
|
Ron Phone #: ###-####
|
Override - Parcel Holds | 2/24/2011 | 1/1/1900 | 2/24/2011 | | |
|
|
|
Plumbing R/i only
|
Other | 2/9/2011 | 2/10/2011 | 2/10/2011 | A | PASS |
Jim Johnson
|
|
|
water test on grease interceptor interceptor test ok
|
Plumbing Rough-in | 2/9/2011 | 2/9/2011 | 2/9/2011 | P | PASS |
Jim Johnson
|
|
|
shane Phone #: ###-#### piping to and from interceptor test ok ok to cover start of 24 hrwater test on interceptor
|
Groundwork | 2/7/2011 | 2/8/2011 | 2/8/2011 | A | PASS |
Jim Johnson
|
|
|
rough in for Stinker station for new addition Phone #: ###-#### >> Inspection requested via web by ron pierce
|
Water and/or Sewer | 2/7/2011 | 2/7/2011 | 2/7/2011 | A | PART |
Jim Johnson
|
|
|
conf. only with contractor on grease interceptor
|
Owner Supplied Equipment | | | 2/1/2011 | | |
|
|
|
|
Application received | | | 2/1/2011 | | DONE |
|
|
|
This permit was created on the web by ron pierce
|