Final | 5/27/2011 | 5/31/2011 | 5/31/2011 | P | PASS |
Jim Johnson
|
|
|
Backflow being installed Saturday, tempering valves going in on Tuesday morning. Would like inspection between 10:30 and 1:30 if possible. Found 1" air gap on ice maching fill, will hold off on backflow until requirements validated. Phone #: ###-#### >> Inspection requested via web by sean rocke
|
Final | 5/26/2011 | 5/27/2011 | 5/27/2011 | A | PART |
Jim Johnson
|
|
|
late morning--peter Phone #: ###-#### additional backflow need double check on water supply to ice machine need R P to water cooled condensing unit,s need double check on refrimalizor . need 120 degree hot water limitation to hand sink,s contractor to recall when ready
|
Plumbing Rough-in | 5/19/2011 | 5/19/2011 | 5/19/2011 | P | PASS |
Jim Johnson
|
|
|
Peter-Later afternoon please Phone #: ###-####
|
Roof Drains | 5/3/2011 | 5/4/2011 | 5/4/2011 | A | PASS |
Jim Johnson
|
|
|
sean Phone #: ###-####
|
Plumbing Rough-in | 4/19/2011 | 4/20/2011 | 4/20/2011 | P | PASS |
Jim Johnson
|
|
|
Peter Phone #: ###-####
|
Application received | | | 4/11/2011 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 4/11/2011 | | |
|
|
|
|
(F) Reprint permit | | | 4/11/2011 | | DONE |
|
|
|
|