Final | 7/27/2011 | 7/28/2011 | 7/28/2011 | A | PASS |
Bill VanDegrift
|
|
|
after GC inspection, check for bld permit grouping final ok
|
Plumbing Rough-in | 5/2/2011 | 5/2/2011 | 5/2/2011 | P | PART |
Bill VanDegrift
|
|
|
1:20 gw in doading dock area 2 flooe sinks and rain water. waste extention and mech deck drains test ok in lab reolcation project.
|
Water and/or Sewer | 4/22/2011 | 4/25/2011 | 4/26/2011 | A | PASS |
Bill VanDegrift
|
|
|
provide history for work done under the FPP for this project to date. to date I've done eight inspections on this project, water line through the building to the air handlers, waste receptors under the air handlers and the sewer from the existing manhole to the waste receptors.
|
Application received | | | 4/22/2011 | | DONE |
|
|
|
This permit was created on the web by Rhonda Marcum
|