Final | 11/16/2011 | 11/17/2011 | 11/17/2011 | A | PASS |
Eric Strole
|
|
|
Ken Phone #: ###-####
|
Fees Due Hold | 10/13/2011 | | 10/21/2011 | | DONE |
Barbara Stitt
|
|
|
|
Plumbing Rough-in | 8/25/2011 | 8/26/2011 | 8/26/2011 | P | PASS |
Daryl Spivey
|
|
|
KEN Phone #: ###-####
|
Plumbing Rough-in | 8/4/2011 | 8/5/2011 | 8/5/2011 | A | PART |
Eric Strole
|
|
|
ken Phone #: ###-####-this was a look at the plumbing that will be covered before rough-in.
|
Application received | | | 8/4/2011 | | |
|
|
|
|
Issue permit | | | 8/4/2011 | | DONE |
|
|
|
|