First Notice | 5/3/2012 | 5/3/2012 | 7/23/2012 | | DONE |
Eric Strole
|
|
|
This permit finaled on the web by Dave Mogel
|
Final | 5/2/2012 | 5/3/2012 | 5/3/2012 | A | PASS |
Eric Strole
|
|
|
|
Final | 5/1/2012 | 5/2/2012 | 5/2/2012 | A | PART |
Eric Strole
|
|
|
Randy Drake Phone #: ###-####-need to caulk 3-compartment sink, need specs on ice machine(has 2 water supplies-looks water cooled?)temp final ok.
|
Final | 3/29/2012 | 3/30/2012 | 3/30/2012 | P | PART |
Eric Strole
|
|
|
Andy Phone #: ###-####-need to caulk all fixtures,have all backflow devices tested and certified, install all equipment, need tempered water to hand sinks, temp final ok.
|
Plumbing Rough-in | 3/20/2012 | 3/21/2012 | 3/21/2012 | P | PASS |
Eric Strole
|
|
|
Andrew Phone #: ###-####
|
Plumbing Rough-in | 3/2/2012 | 3/2/2012 | 3/2/2012 | P | PART |
Eric Strole
|
|
|
Andy Phone #: ###-####-ground work and inwall water in bar area pass.
|
Groundwork | 2/22/2012 | 2/23/2012 | 2/23/2012 | A | PEND |
Eric Strole
|
|
|
ground work was for two 2" flr sinks and one 3" flr drain in bar area. test pass, still need tie-in to building drain. ok to cover at there own risk. will pass when approved plans are issued and can verify plumbing is per approved plans.
|
Groundwork | 2/22/2012 | 2/22/2012 | 2/22/2012 | P | NR |
Eric Strole
|
|
|
late pm//Randy Drake Phone #: ###-####-needs to test dwv.
|
Application received | | | 2/22/2012 | | DONE |
|
|
|
This permit was created on the web by Dave Mogel
|
Issue PAID IN FULL permit | | | 2/22/2012 | | DONE |
Tisha Gallop
|
|
|
|