Final | 11/19/2013 | 11/19/2013 | 11/19/2013 | P | PASS |
Daryl Spivey
|
|
|
per 353 request roof drain tie in to site drainage ok........ds
|
CHANGE STATUS TO (I) | | | 11/19/2013 | | DONE |
Tisha Gallop
|
|
|
work still in progress per 353
|
Water and/or Sewer | 9/5/2013 | 9/5/2013 | 9/5/2013 | A | PASS |
Daryl Spivey
|
|
|
24 test ok on grease int............ds
|
DOC - Permit Finaled | 9/5/2013 | 9/5/2013 | 9/5/2013 | P | PASS |
Daryl Spivey
|
|
|
|
Final | 9/3/2013 | 9/4/2013 | 9/4/2013 | P | PART |
Daryl Spivey
|
|
|
for grease interceptor // tim jensen Phone #: ###-#### start 24 hr test on tank..........ds
|
CHANGE STATUS TO (I) | | | 9/3/2013 | | DONE |
Tisha Gallop
|
|
|
still need insp on grease interceptor per Tuffy Excavation
|
PLM-Aging Inspection | 2/14/2013 | 2/14/2013 | 2/15/2013 | | PASS |
Daryl Spivey
|
|
|
|
DOC - Permit Finaled | 2/15/2013 | 2/15/2013 | 2/15/2013 | P | PASS |
Daryl Spivey
|
|
|
|
Water and/or Sewer | 11/15/2012 | 11/15/2012 | 11/15/2012 | A | PEND |
Daryl Spivey
|
|
|
Gave Jamaal from ESI a correction notice to resubmit plan reflecting changes to sewer and water service's that deviate from approved submitted set of plans....Per BV.............ds
|
Water and/or Sewer | 10/31/2012 | 10/31/2012 | 10/31/2012 | A | PART |
Daryl Spivey
|
|
|
Last entry by mistake
tie in from flammable intercepter to six inch building drain done and passed ok.......ds
|
Water and/or Sewer | 10/30/2012 | 10/31/2012 | 10/31/2012 | A | FAIL |
Daryl Spivey
|
|
|
Tim Phone #: ###-#### Pan drain not installed correctly and T&P needs to be ran to within 6 inches of floor. T&P drain not to be drained into pan..............ds
|
Water and/or Sewer | 7/30/2012 | 7/31/2012 | 7/31/2012 | A | CANC |
Daryl Spivey
|
|
|
>> Inspection requested via web by Michael Nuxoll
|
Water and/or Sewer | 7/30/2012 | 7/30/2012 | 7/30/2012 | P | PART |
Daryl Spivey
|
|
|
sewer tie in to 8 inch at street, between ele vault aturned north just past north vault and capped.............ds
|
Issue PAID IN FULL permit | | | 7/25/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 7/25/2012 | | DONE |
|
|
|
This permit was created on the web by Michael Nuxoll
|
First Notice | 11/19/2013 | 11/19/2013 | | | |
Daryl Spivey
|
|
|
|