Final | 11/9/2012 | 11/13/2012 | 11/13/2012 | A | PASS |
Eric Strole
|
|
|
CALL PERRY FOR ACCESS, ###-####. REMODEL FINAL TRIM INSPECT. THANKS! Phone #: ###-#### >> Inspection requested via web by Chris Field
|
Water and/or Sewer | 10/9/2012 | 10/10/2012 | 10/10/2012 | A | PASS |
Eric Strole
|
|
|
BF ASSEMBLY IS RAISED NOW PER INSPECTOR INSTRUCTIONS. Phone #: ###-#### >> Inspection requested via web by Chris Field
|
Water and/or Sewer | 10/4/2012 | 10/5/2012 | 10/5/2012 | A | FAIL |
Eric Strole
|
|
|
PVB WAS TESTED & TAGGED PRIOR TO INSPECTOR''S FIRST VISIT. TECH CHECKED IT AGAIN 10/4, BACKFLOW TEST TAG STILL ATTACHED TO ASSEMBLY. INPSECTION NEEDS TO BE PASSED. THANKS. Phone #: ###-#### >> Inspection requested via web by Chris Field-pvb needs to be 12" above finished grade.
|
Water and/or Sewer | 10/1/2012 | 10/1/2012 | 10/1/2012 | P | PART |
Eric Strole
|
|
|
MAIN WATER LINE REPLACEMENT Phone #: ###-#### >> Inspection requested via web by Chris Field-ok to cover waterline, pvb needs tested and certified.
|
Plumbing Rough-in | 9/27/2012 | 9/28/2012 | 9/28/2012 | P | PASS |
Eric Strole
|
|
|
BATHROOM REMODEL ROUGH IN. PM FRIDAY. JOB MGR PERRY, ###-####. Phone #: ###-#### >> Inspection requested via web by Chris Field
|
Issue PAID IN FULL permit | | | 9/19/2012 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 9/19/2012 | | DONE |
|
|
|
This permit was created on the web by Chris Field
|