Final | 5/1/2013 | 5/2/2013 | 5/2/2013 | A | PASS |
Daryl Spivey
|
|
|
Don Phone #: ###-####
|
Plumbing Rough-in | 2/21/2013 | 2/22/2013 | 2/22/2013 | A | PASS |
Daryl Spivey
|
|
|
don Phone #: ###-####
|
Other | 2/5/2013 | 2/6/2013 | 2/6/2013 | A | DONE |
Daryl Spivey
|
|
|
conf - don Phone #: ###-#### talked about adding 3 more toilets on and pipe sizing required for connection....4 inch.........ds
|
Groundwork | 11/20/2012 | 11/20/2012 | 11/20/2012 | P | PASS |
Daryl Spivey
|
|
|
Don Phone #: ###-#### need to tie other 2 WC's to a 4 in. line.......ds
|
Application received | | | 11/20/2012 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/20/2012 | | DONE |
Barbara Stitt
|
|
|
|