First Notice | 5/31/2013 | 5/31/2013 | 10/9/2013 | | DONE |
Jim Johnson
|
|
|
|
Final | 5/31/2013 | 5/31/2013 | 5/31/2013 | P | PASS |
Jim Johnson
|
|
|
Greg Phone #: ###-####
|
Final | 5/29/2013 | 5/30/2013 | 5/30/2013 | A | FAIL |
Eric Strole
|
|
|
Greg Phone #: ###-####-need to caulk sinks and need open seat on toilet.
|
Sprinkler (Final) | 5/23/2013 | 5/23/2013 | 5/23/2013 | P | PART |
Jim Johnson
|
|
|
DON Phone #: ###-#### new double check installed on existing tie-in ok need to have tested and certified
|
Plumbing Rough-in | 5/21/2013 | 5/22/2013 | 5/22/2013 | A | PASS |
Jim Johnson
|
|
|
greg Phone #: ###-####
|
(F) Reprint permit | | | 5/22/2013 | | DONE |
|
|
|
|
Groundwork | 5/20/2013 | 5/20/2013 | 5/20/2013 | P | PART |
Jim Johnson
|
|
|
Greg-rough in inspection also please Phone #: ###-#### ground work ok ok to cover need to install premius protection with an approved expansion tank and main building shut off valve pprior to final inspection call contractor on premius protection
|
Application received | | | 5/20/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 5/20/2013 | | DONE |
Barbara Stitt
|
|
|
|