Final | 7/29/2013 | 7/29/2013 | 7/29/2013 | P | PASS |
Eric Strole
|
|
|
nate Phone #: ###-####
|
Final | 6/26/2013 | 6/26/2013 | 6/26/2013 | P | PART |
Eric Strole
|
|
|
NATHAN Phone #: ###-####-need to use approved material for T&P and caulk all fixtures.
|
Plumbing Rough-in | 6/11/2013 | 6/12/2013 | 6/12/2013 | A | PASS |
Bill VanDegrift
|
|
|
call for access info.// Nathan Phone #: ###-#### ri ok
|
Plumbing Rough-in | 6/10/2013 | 6/11/2013 | 6/11/2013 | A | FAIL |
Eric Strole
|
|
|
Nathan Phone #: ###-####-cannot tie shower drain into toilet trap arm, need to nailplate and tent over head waterline to shower head and need access to over head venting and need to do running test on dwv.
|
Plumbing Rough-in | 6/5/2013 | 6/6/2013 | 6/6/2013 | P | PART |
Eric Strole
|
|
|
Nate-Please call at least 30 mins prior to inspection Phone #: ###-####-main bath ok to cover
|
Override - Parcel Holds | 6/5/2013 | 1/1/1900 | 6/5/2013 | | |
|
|
|
Plumbing rough in
|
Application received | | | 6/5/2013 | | |
|
|
|
|
Override - Parcel Holds | | | 6/5/2013 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 6/5/2013 | | DONE |
Barbara Stitt
|
|
|
|