First Notice | 9/26/2013 | 9/26/2013 | 3/6/2014 | | DONE |
Jim Johnson
|
|
|
|
Print Statement | | | 3/6/2014 | | DONE |
Christina Prado
|
|
|
|
Final | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | PASS |
Jim Johnson
|
|
|
Can Jim call me with estimate of arrival time so I can have Bill with "coke" there at same time, so we can get this job finaled. Thank''s Phone #: ###-#### >> Inspection requested via web by lon holtzmaster
|
Final | 9/23/2013 | 9/23/2013 | 9/23/2013 | A | PART |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by lon holtzmaster need to correct piping on carbonator and water filter system need to pipe to correct backflow device contractor to recall when ready oked temp
|
Final | 9/17/2013 | 9/18/2013 | 9/18/2013 | A | PART |
Jim Johnson
|
|
|
Early Morning If Possible. Thanks Phone #: ###-#### >> Inspection requested via web by lon holtzmaster walk through with contractor
|
Final | 9/16/2013 | 9/16/2013 | 9/16/2013 | P | CANC |
Jim Johnson
|
|
|
Partial final . thanks Phone #: ###-#### >> Inspection requested via web by lon holtzmaster canc by contractor will recall when ready
|
Plumbing Rough-in | 7/23/2013 | 7/24/2013 | 7/24/2013 | P | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by lon holtzmaster
|
Groundwork | 6/19/2013 | 6/20/2013 | 6/20/2013 | A | PASS |
Jim Johnson
|
|
|
Phone #: ###-#### >> Inspection requested via web by lon holtzmaster
|
Issue PAID IN FULL permit | | | 6/19/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Owner Supplied Equipment | | | 6/19/2013 | | |
|
|
|
|
Application received | | | 6/19/2013 | | DONE |
|
|
|
This permit was created on the web by lon holtzmaster
|