Sprinkler (Final) | 12/3/2013 | 12/3/2013 | 12/3/2013 | A | PASS |
Bill VanDegrift
|
|
|
|
Sprinkler (Final) | 11/14/2013 | 11/14/2013 | 11/14/2013 | P | PART |
Bill VanDegrift
|
|
|
dcva needs testing and install a second clamp at joint upstream of the dcva.
|
Issue PAID IN FULL permit | | | 11/13/2013 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 11/13/2013 | | DONE |
|
|
|
This permit was created on the web by Stacy Doran
|