Final | 8/27/2014 | 8/28/2014 | 8/28/2014 | A | PASS |
Daryl Spivey
|
|
|
Master bath re-configuration. Front door open. Early if possible, thank you. Phone #: ###-#### Inspection requested via web by fritz ramisch
|
Water and/or Sewer | 6/5/2014 | 6/5/2014 | 6/5/2014 | P | PASS |
Daryl Spivey
|
|
|
mid PM if possible. Thanks Phone #: ###-#### >> Inspection requested via web by fritz ramisch
|
Water and/or Sewer | 4/21/2014 | 4/21/2014 | 4/21/2014 | P | CANC |
Daryl Spivey
|
|
|
between floor and up inspection so the floor can be covered. We will be there. Phone #: ###-#### >> Inspection requested via web by fritz ramisch
|
Plumbing Rough-in | 4/21/2014 | 4/21/2014 | 4/21/2014 | P | PASS |
Daryl Spivey
|
|
|
between floor and up inspection so the floor can be covered. We will be there. Phone #: ###-#### >> Inspection requested via web by fritz ramisc ok to cover............ds
|
Issue PAID IN FULL permit | | | 4/15/2014 | | DONE |
|
|
|
Payment received via Govolutions
|
Application received | | | 4/15/2014 | | DONE |
|
|
|
This permit was created on the web by fritz ramisch
|